How to price a painting job
Margin is not markup, and confusing the two is how a painter works at 17% while believing they are on 20%. The arithmetic, the day rate, and what a quote has to say.
Pricing a job is three numbers: what it costs, what you add, and what the customer pays. The middle one is where the money is lost, because margin and markup are different calculations and the wrong one is the intuitive one.
Margin is not markup
Take a job costing €1,000 and add “20%”.
- Markup:
1000 × 1.20= €1,200. Your profit is €200 on a €1,200 sale, which is 16.7% of what the customer paid. - Margin: you want €200 to be 20% of the selling price, so
1000 ÷ (1 − 0.20)= €1,250. Profit €250, which is 20% of €1,250.
The gap is €50 on a small job. On €80,000 of annual turnover priced this way it is a few thousand euros of profit that never existed.
The formula worth memorising:
selling price = cost ÷ (1 − margin)
| Margin you want | Multiply cost by |
|---|---|
| 10% | 1.111 |
| 15% | 1.176 |
| 20% | 1.250 |
| 25% | 1.333 |
| 30% | 1.429 |
| 40% | 1.667 |
Neither approach is wrong as such, the mistake is saying margin and calculating markup, which is what most people do.
What goes into cost
Everything you will spend. The lines that get missed:
- Materials: paint, primer, filler, tape, sheeting, sandpaper, brushes and rollers that will not survive the job. Cost the tins you buy, not the litres you use.
- Labour: hours × your true hourly cost, not what you would like to earn. See below.
- Access: tower, ladders, scaffolding, hire and delivery.
- Preparation: often the bulk of the hours on an older property, and the thing most often underestimated. Stripping, filling, sanding, washing down.
- Waste and disposal: a skip, or trips to the tip.
- Travel: kilometres and the time to drive them.
- Making good: protecting floors, moving furniture, the tidy at the end.
The day rate that is not a day rate
The most common error after margin: dividing a target salary by 220 working days and calling that the day rate.
The days you can invoice are not the days you work. Out of roughly 220:
| Days | |
|---|---|
| Nominal working days | 220 |
| Quoting, site visits, admin, invoicing | −35 |
| Buying materials, travel between jobs | −20 |
| Illness, weather, gaps between jobs | −20 |
| Actually billable | ≈145 |
So a €50,000 target is not €227 a day, it is €345, and that is before materials, van, insurance, tools, accountant, and the pension nobody is paying into.
Work out your real annual costs, divide by the days you can actually bill, and that is the floor. The number is usually uncomfortable, and the discomfort is the point: quoting below it is working for nothing while being busy.
Estimating the hours
Rules of thumb, for a competent painter with everything to hand:
| Task | Rate |
|---|---|
| Rolling walls, two coats, prepared | 10–14 m²/hour |
| Cutting in | 12–18 m/hour |
| Ceilings, two coats | 8–12 m²/hour |
| Doors, both sides, prepared | 1–1.5 hours each |
| Skirting and architrave | 8–12 m/hour |
| Windows, by size and glazing bars | 1–3 hours each |
| Filling and sanding, light | 15–25 m²/hour |
| Stripping wallpaper | 4–8 m²/hour |
Two warnings. Preparation is the variable, not the painting: the painting rates above are reliable, the preparation ones are not, and on an old property preparation is most of the job. And small rooms are slower per square metre than large ones: a bathroom is nearly all cutting in.
VAT, which is not part of your margin
VAT is collected on behalf of the state and passes through you. It is not income and it must not be inside the margin calculation.
Two things specific to Belgium worth getting right:
- The reduced rate for renovation. Work on a dwelling above a certain age, for a private customer, qualifies for a reduced rate rather than the standard one, subject to conditions on the property and the customer. It is a real saving to the customer and worth confirming per job, because getting it wrong in either direction is expensive.
- Reverse charge for business customers. Where it applies, you invoice without VAT and the customer accounts for it. That requires the customer’s VAT number on the invoice, and a stated legal mention. Without the number it is not a valid reverse charge.
Whatever applies, the rate a job carries should be fixed when the quote is issued, and the quote should print the rate beside the amount. “VAT (21%): €0.00” on a reverse-charge quote is a contradiction a customer will query and an auditor will notice.
What the quote itself has to do
A quote is a document that has to survive being read weeks later by someone who was not at the site visit.
- Scope, in plain terms. Which rooms, which surfaces, how many coats. “Two coats to walls and ceiling; woodwork not included” prevents the argument.
- What is excluded, explicitly. Furniture moving, wallpaper stripping, repairs to plaster.
- The materials, if the customer is choosing colours later, name the product and grade so a change of mind is a visible variation rather than an assumption.
- A validity period. Paint prices move. Thirty days is normal.
- Payment terms, and a deposit for anything substantial.
- The VAT treatment, as above.
And keep the terms that were attached when it was sent. If your terms change next year, the quote you issued this year was issued under the old ones.
Discounting
If a customer asks for 10% off a €1,250 quote at 20% margin, the €125 comes entirely out of the €250 profit. A 10% discount is a 50% pay cut on that job.
Knowing that number before the conversation is the whole point. Better responses than a discount: reduce the scope, move the date to fill a gap, or split the work across two visits. Each of those costs you something you have; a discount costs you the thing you were doing the job for.
Doing it for a real job
CoatQuote costs a job the way this page describes: materials by tins bought rather than litres used, labour by measured area, margin as a share of the selling price rather than a markup on cost: then applies the VAT treatment, produces the customer-facing quote lines, and exports a branded PDF with your terms and a validity date on it.